Installation of horizontal sand mill

How should worker do installation when received horizontal sand mill/bead mill? here is summary:

 

1. Open the top cover of the base and inject about 5kg of 10# oil into the oil tank of the base.


2. There is no need for anchor screw positioning, and it can be placed at any time, but the foundation ground should be solid and flat.


3. When installing each model, there should be a distance of more than 1 meter around it to facilitate operation and maintenance and the introduction of water and electricity.


4. Power supply: Each user should connect the corresponding power line according to the purchased model, and it is recommended to install a fuse on each line.


5. Motor steering: The main motor can be jogged during initial installation, and its steering should be consistent with the direction of the sign.


6. Connect the cooling water pipe, tighten the joints, and add a stop valve before the total water inlet to control the amount of water. Users can connect external hoses or hard pipes according to their own site conditions.


(SIEGMA-China manufacturer and exporter of bead mill,sand mill,nano bead mill,ink bead mill,ceramic bead mill,food grade bead mill,pharmaceuticals bead mill,horizontal bead mill,SC bead mill, dye bead mill,pigment bead mill,dyno mill,agitating bead mill)

CATEGORIES

CONTACT US

Contact: Lucas Shu

Phone: +86-183 2590 9192

E-mail: export@siegmachine.com

Whatsapp:+86-183 2590 9192

Add: NO.556,caofeng road,Jiading district,Shanghai, China